Istanbul Ship Repairs

Planning a ballast water treatment retrofit

Start with the vessel’s drawings, scan data and available installation window. Pipe fabrication can be prepared from drawings and 3D scans before the ship arrives.

Plan workshop and onboard work together. Review access, pipe routing, material availability and the timing of commissioning tests before deciding between an alongside, docked or phased installation.